back

BEBO Bicycle Tunnel

06.04.2021

E24/3 Arch Structure with Stepped Bevelled Ends

The new connection link from the A67 highway to the west of Eindhoven NED called for an underpass of the Moormanlaan Bike path immediately north of the A67.

The BEBO E24/3 Arch sitting on cast-in-situ pedestal footings offers the required clearance profile while the stepped bevel gives the structure an aesthetically pleasing appearance.

Congratulations to the team at Martens Prefab for the successful supply of this beautiful BEBO Precast Concrete Arch Tunnel.